Bespoke Stairwell-Pro Access System – Charing Cross Station

Close-up of Alto's bespoke Stairwell-Pro access platform spanning escalators at Charing Cross Underground station, showing the modular aluminium structure and working platform.

Project: Charing Cross London Underground Station

Sector: Rail & Transport Infrastructure

Product: Stairwell-Pro

Application: Escalator tunnel access / ceiling panel removal

Client/Contractor: Spoor-Tech

The Challenge

Working within the restricted environment of an escalator tunnel at Charing Cross London Underground station to carry out remedial works and upgrades behind the ceiling panels presented a complex access challenge.  As with many rail related applications, works had to be completed within a scheduled possession period to minimise disruption to passengers.
The system needed to provide a stable working platform above two escalators and a central staircase, which are set at differing gradients while accommodating changes in level and working within the confined geometry of the tunnel.

 

Two Spoor-Tech engineers working from a bespoke Alto Stairwell-Pro access platform above the escalators at Charing Cross London Underground station.Project photographs courtesy of Spoor-Tech

The Solution

Working alongside Spoor-Tech, an accredited Tier 1 contractor delivering works for Transport for London, Alto Access Products designed and supplied a bespoke Stairwell-Pro system, customised specifically for the application and provided product specific training to their staff.
The configuration was engineered to span the two escalators and central stair, creating a secure working platform while adapting to the different levels within the tunnel.
This allowed the contractor to access the ceiling area required for panel removal without relying on a conventional access arrangement that would have been unsuitable for the restricted space, varying levels and short duration execution period for the project.

Wide view of Alto's bespoke Stairwell-Pro access platform spanning the escalators and central staircase at Charing Cross London Underground station, providing overhead access for Spoor-Tech engineers.

The Result

The bespoke Stairwell-Pro configuration provided a stable and secure working platform within a challenging live transport environment, demonstrating the system's ability to be adapted to complex access requirements.
The project also highlighted the benefits of a modular access system that can be configured around existing infrastructure, rather than requiring the working environment to be altered to accommodate the access solution.

Why Stairwell-Pro?

  • Bespoke configurations for complex access requirements
  • Specifically designed for use around stairs and changes in level in restricted spaces
  • Modular design allows systems to be adapted to individual applications
  • Provides stable working platforms in restricted environments
  • Suitable for demanding rail and transport infrastructure applications
  • Certified to BS 1139-6: 2022

Why Alto?

Alto Access tower systems are the strongest, most versatile, most adaptable towers available on the market today.  Our design and product support teams help our customers deliver uniquely effective access solutions.

Contact us → Click here

Need access for a complex rail or infrastructure project?

From stairwell access through linked and bridging towers to bespoke platforms and systems designed around existing infrastructure, Alto can help develop a practical access solution for challenging environments.

Related product:
Explore Alto Stairwell-Pro → Click here
Discover the modular access system used for this project.